| Sublift 40T Construction photos | ||||||
| <-- previous | - back to gallery | next --> | ||||
| Last lifting arm on the right handside of the machine being lifted into the arm before securing. The complex data cables can be seen terminating in the cage which will eventually house the main hydraulic valve banks for the lifting rams and right hand drive motors. | ||||||